Thanks to an extraordinary effort by Daniel Blacka from Blacka’s Pipeline & Excavations and Tyson Moon from Moons Earthworks, the track has been fully repaired at turns 6 to 9 following damage that occurred in 2022 as a result of torrential rain.
The track is now fully operational for FREE member practice with racing scheduled to return 21 April 2024.
Track Repaired Turns 6 to 9